The final phase of work on the Amex Stadium, Brighton has been completed by Industrial Door Engineering (IDE)

The latest works included the installation of a number of electric roller shutters and fire roller shutters on Kiosks and areas of Crowd Segregation.

The 18 month contract has seen the installation of nearly (100) roller shutters and fire shutters by IDE around the 30,000 seater stadium which is considered to be one of the most prestige stadium projects in the south of England.