Industrial Door Engineering have won an order for high specification insulated roller shutter doors and various steel hinged doors on the new Waste Facility Development at Airbus, Chester.

The contract is with MPH Construction who are already well advanced with the development and will require the doors from IDE within the next two months. The insulated roller shutters will work off a hi-tech radar and inductive loop system similar to that already installed within the main Airbus site by IDE.

IDE were specified for the door contract by Airbus due to the long standing arrangement and continued working relationship that IDE and Airbus have between one another.